• About Us
  • Our Editorial Policy
  • Business Directory
  • Advertise with Us
  • Our Advertisers
  • Contact Us
Australia India News
  • Alluring India - Brisbane Banner
India News Australia
  • Home
  • Current Issue
    Past Issue
  • India News
  • Politics
  • Business
  • World
    World This Week
  • Community News
  • What's On
  • Others
    Yoga in Australia News COVID-19 Community News Naari IPL News Health Travel Entertainment
  • Migrants Expo
  • National Events
  • Please wait..
Business and Trade news

Mumbai-Ahmedabad bullet train: Second tunnel boring machine assembly begins at Savali ​

  • BY India News Newsdesk
  • April 11, 2026
  • 0 COMMENTS

Ahmedabad/Mumbai, April 11 (IANS) The assembly of the second Tunnel Boring Machine (TBM) for the Mumbai-Ahmedabad High Speed Rail corridor has commenced at Savali near Ghansoli, marking a key phase in the development of the underground section of India’s first bullet train project.​

The machine is being assembled approximately 39 metres below ground level at the Savali shaft, from where it will be deployed to drive tunnels towards Vikhroli as part of the Mumbai-Ahmedabad Bullet Train corridor.​

As part of the ongoing installation process, a 190-metric-tonne gantry was lowered into position.​

The structure measures 18 metres in length, 10 metres in width and 9 metres in height.​

Project officials said each TBM in the corridor will be equipped with four gantries, which are connected to the main shield assembly and cutterhead.​

These gantries will remain integrated with the TBM during tunnel excavation and will assist in key operations, including excavation, waterproofing, and the installation of precast tunnel lining segments.​

Given the limited working space at the Savali shaft, engineers have assembled at depth using carefully sequenced lifting operations and controlled installation methods.​

The initial tunnelling drive from Savali is scheduled to begin in July.​

In a separate major engineering milestone reported earlier this week, a 1,360-metric-tonne precast portal beam was successfully launched over an operational railway line near Maninagar area in Ahmedabad.​

The 34-metre-long structure, with a cross-section of 5.5 metres by 4.5 metres, was installed over the Ahmedabad-Vadodara section as part of the elevated viaduct works for the bullet train corridor.​

The operation was completed in around 3.5 hours during full traffic and power block coordinated with Indian Railways, using a 2,200-tonne crawler crane along with auxiliary lifting systems and high-strength prestressed anchoring equipment.​

The Mumbai-Ahmedabad High Speed Rail project spans approximately 508 kilometres between Bandra Kurla Complex in Mumbai and Sabarmati in Ahmedabad, with stations planned across Maharashtra and Gujarat.​

The corridor is being developed by the National High Speed Rail Corporation Limited (NHSRCL), and is based on Japanese Shinkansen technology.​

It includes a combination of elevated viaducts, bridges and underground tunnels, intending to significantly reduce travel time between the two cities once operational.​

–IANS

mys/dan

​

Post navigation

Govt committed to empowering farmers, rural economy: Maha Minister
Monetary sops, infra push key features of Delhi’s draft EV Policy 2026​

Related Post

75 pc Indian firms name AI a board‑level priority: Report
June 4, 2026
Pakistan suffers $1.4 billion economic hit amid geopolitical tensions: Report
June 4, 2026
Jitin Prasada highlights India’s growth, resilience amid global uncertainties at GBRC
June 4, 2026
BSE arm launches 5-year sovereign bond benchmark for passive investment
June 4, 2026

Our Current Issue

Alluring India 2026

Alluring India 2026

Our Advertisers

  • Battery Rebate australia
  • Bess Australia Solar Panels
  • Alluring India - Brisbane 2026

Follow Us

  • facebook
  • facebook
  • facebook
  • facebook
INDIA NEWS on YouTube in Australia, bring to our readers and subscribers national and international news, editorials, expert columns, community activities and interviews of political leaders, celebrities, business professionals, academics and sport personalities among others.
  • facebook
  • facebook
  • facebook
  • facebook

Category

  • Accident
  • Adani Australia
  • Advertorial
  • Arts & Culture
  • Ashes 2022
  • Australia

Recent News

  • ‘No less than opposite gender’: Shooter Esha...
  • Malviya Nagar inferno: 15 admitted in Max...

Subscribe Newsletter

Get the latest creative news from india news

  • Privacy Policy
  • Disclaimer